|
编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
154838 | 福城南干道中段一期施工图2/5 | winmsp | 47,185KB | .rar | 2020/11/20 | 2/519 | ¥8.00 |
154837 | 福城南干道中段一期施工图1/5 | winmsp | 47,185KB | .rar | 2020/11/20 | 2/773 | ¥15.00 |
154835 | 重庆江津区德泽路三期施工图2/2 | winmsp | 42,844KB | .rar | 2020/11/20 | 1/867 | ¥15.00 |
154834 | 重庆江津区德泽路三期施工图1/2 | winmsp | 47,185KB | .rar | 2020/11/20 | 1/1069 | ¥15.00 |
154833 | 彭水新城五湖片区道路施工图2/2 | winmsp | 24,412KB | .rar | 2020/11/20 | 3/662 | ¥15.00 |
154832 | 彭水新城五湖片区道路施工图1/2 | winmsp | 47,185KB | .rar | 2020/11/20 | 3/805 | ¥15.00 |
154831 | 重庆高新区虎峰大道西延段图纸3/3 | winmsp | 4,076KB | .rar | 2020/11/20 | 4/526 | ¥14.00 |
154830 | 重庆高新区虎峰大道西延段图纸2/3 | winmsp | 47,185KB | .rar | 2020/11/20 | 4/568 | ¥15.00 |
154829 | 重庆高新区虎峰大道西延段图纸1/3 | winmsp | 47,185KB | .rar | 2020/11/20 | 4/758 | ¥15.00 |
154824 | 铁建重工培训-盾构机液压原理 | xiaoludan | 26,279KB | .ppt | 2020/11/20 | 0/691 | ¥3.00 |
154823 | 溧阳至宁德高速03段测量总体工作规划 | 非必填 | 3,951KB | .doc | 2020/11/20 | 2/679 | ¥5.00 |
154822 | 盾构典型事故安全分析与防止措施 | xiaoludan | 50,845KB | .zip | 2020/11/19 | 0/874 | ¥3.00 |
154821 | 盾构机械构成及工作原理培训2016 | xiaoludan | 47,633KB | .ppt | 2020/11/19 | 0/665 | ¥5.00 |
154820 | 盾构法技术发展与展望(2/2) | xiaoludan | 47,042KB | .ppt | 2020/11/19 | 0/782 | ¥2.00 |
154819 | 盾构法技术发展与展望(1/2) | xiaoludan | 43,856KB | .ppt | 2020/11/19 | 0/837 | ¥2.00 |
154817 | 隧道超欠挖控制新技术ppt | xiaoludan | 38,917KB | .zip | 2020/11/19 | 0/783 | ¥5.00 |
154816 | 水下隧道设计与施工技术探讨2/2 | xiaoludan | 21,757KB | .zip | 2020/11/19 | 0/580 | ¥3.00 |
154815 | 水下隧道设计与施工技术探讨1/2 | xiaoludan | 37,748KB | .z01 | 2020/11/19 | 0/689 | ¥3.00 |
|