|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 145756 | 滨湖路1-30m人行拱桥图纸 | kaermalong | 5,592KB | .zip | 2020/3/24 | 4/1583 | ¥14.00 |
| 145754 | ★四川新版20m小箱梁通用图 | Ystxs | 4,197KB | .zip | 2020/3/24 | 11/1526 | ¥5.00 |
| 145751 | 15+60+15m三跨人行悬索桥图纸 | kaermalong | 9,244KB | .zip | 2020/3/24 | 7/1885 | ¥23.00 |
| 145750 | 桥梁结构与美观的协调-邓文中 | lixuhit | 33,365KB | .pdf | 2020/3/24 | 3/1188 | ¥8.00 |
| 145733 | ★钢桥抗震设计2019版 | ap1le | 12,687KB | .pdf | 2020/3/24 | 14/1228 | ¥8.00 |
| 145732 | ★钢桥-钢结构与组合结构桥梁2017版 | ap1le | 26,781KB | .pdf | 2020/3/24 | 17/2186 | ¥8.00 |
| 145731 | Cable Stayed Bridge(4/4) | vten1 | 26,329KB | .zip | 2020/3/24 | 2/614 | ¥2.00 |
| 145730 | Cable Stayed Bridge(3/4) | vten1 | 31,457KB | .z03 | 2020/3/24 | 2/579 | ¥5.00 |
| 145729 | Cable Stayed Bridge(2/4) | vten1 | 31,457KB | .z02 | 2020/3/24 | 2/610 | ¥5.00 |
| 145728 | Cable Stayed Bridge(1/4) | vten1 | 31,457KB | .z01 | 2020/3/24 | 2/893 | ¥5.00 |
| 145711 | 2019天津相变自调温沥青路面规范 | 薛万新 | 342KB | .pdf | 2020/3/23 | 1/901 | ¥2.00 |
| 145710 | 2019天津公路沥青路面集料技术规范 | 薛万新 | 329KB | .pdf | 2020/3/23 | 0/900 | ¥3.00 |
| 145709 | JCT2019后张法预应力混凝土带翼箱梁 | 薛万新 | 1,683KB | .pdf | 2020/3/23 | 4/1106 | ¥3.00 |
| 145707 | ★GB38509-2020滑坡防治设计规范 | CHIMU007 | 6,984KB | .pdf | 2020/3/23 | 8/1249 | ¥3.00 |
| 145706 | Excel复合地基沉降计算xls | fengzhen1030 | 76KB | .xls | 2020/3/22 | 1/1059 | ¥2.00 |
| 145702 | 张家口杏林堡景观桥汇报 | xtyz912 | 6,751KB | .pdf | 2020/3/21 | 4/1974 | ¥8.00 |
| 145695 | 教材:隧道工程_王成2009版 | 1046711459 | 32,428KB | .pdf | 2020/3/20 | 0/1047 | ¥3.00 |
| 145694 | 理论力学II_哈工大2009 第七版 | 1046711459 | 9,722KB | .pdf | 2020/3/20 | 0/820 | ¥3.00 |
|