|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 40368 | 某水电站大坝及溢洪道监理实施细则 | windman | 193KB | .rar | 2008/7/14 | 0/2489 | ¥2.00 |
| 40367 | 水利工程监理细则(大全) | windman | 182KB | .rar | 2008/7/14 | 1/3084 | ¥12.00 |
| 40366 | 某道路监理工作实施细则 | windman | 17KB | .rar | 2008/7/14 | 1/2676 | ¥3.00 |
| 40365 | 杭州北景园小区安全监理细则 | windman | 71KB | .rar | 2008/7/14 | 0/1878 | ¥2.00 |
| 40360 | 南京大学基坑支护毕业设计 | Prince | 1,557KB | .rar | 2008/7/14 | 2/2263 | ¥5.00 |
| 40355 | 52+80+52m连续刚构桥 | xianlzc | 6,832KB | .rar | 2008/7/13 | 6/3766 | ¥12.00 |
| 40354 | 毕业设计-5×40m等截面连续梁 | 董文军 | 30,310KB | .doc | 2008/7/13 | 1/2307 | ¥8.00 |
| 40351 | ★深圳某市政道路初步设计(2/2) | Prince | 12,687KB | .rar | 2008/7/13 | 15/2115 | ¥5.00 |
| 40350 | ★深圳某市政道路初步设计(1/2) | Prince | 13,631KB | .rar | 2008/7/13 | 16/2613 | ¥5.00 |
| 40349 | ★现浇梁跨高速公路门洞设计计算 | 董文军 | 4,346KB | .doc | 2008/7/13 | 9/3225 | ¥5.00 |
| 40348 | 桥梁大师2005-用户入门手册 | Prince | 2,858KB | .rar | 2008/7/13 | 3/2850 | ¥3.00 |
| 40346 | ★苏通长江大桥审核报告-基础部分 | Prince | 851KB | .pdf | 2008/7/13 | 9/2939 | ¥8.00 |
| 40345 | 苏通大桥主航道桥基础及墩身设计说明书 | zhang732000 | 246KB | .rar | 2008/7/12 | 7/3088 | ¥5.00 |
| 40343 | Flac3d高级培训教程 | huhao119 | 2,560KB | .pdf | 2008/7/12 | 2/1801 | ¥3.00 |
| 40340 | 预应力连续箱梁挂篮悬臂浇筑施工工工法 | 肖遥 | 3,079KB | .doc | 2008/7/12 | 7/4293 | ¥3.00 |
| 40339 | 桥梁承台基坑支护方案 | 肖遥 | 233KB | .doc | 2008/7/12 | 145/3660 | ¥0.00 |
| 40338 | 弹性力学的变分原理及其应用1981版 | ilovemusic | 7,644KB | .rar | 2008/7/12 | 2/3013 | ¥3.00 |
| 40336 | 铁路工程施工质量验收标准应用指南 | zhchg_1 | 1,687KB | .rar | 2008/7/12 | 3/2453 | ¥8.00 |
|