|
|
| 编号 | 文件名称 | 上传用户 | 文件大小 | 类型 | 上传日期 | 下载/浏览 | 价格(元) |
| 63675 | 汉江大桥锚固桥台预应力加固试验报告2/2 | xianggegege | 17,433KB | .rar | 2010/6/4 | 0/1864 | ¥10.00 |
| 63674 | midas北京5月培训资料汇总(2/8) | zxm58 | 18,874KB | .rar | 2010/6/4 | 5/2043 | ¥4.00 |
| 63673 | midas北京5月培训资料汇总(1/8) | zxm58 | 18,874KB | .rar | 2010/6/4 | 6/2577 | ¥4.00 |
| 63672 | 汉江大桥锚固桥台预应力加固试验报告1/2 | xianggegege | 17,500KB | .rar | 2010/6/4 | 0/2282 | ¥10.00 |
| 63669 | 某二级公路设计投标汇报材料PPT | fx | 5,163KB | .ppt | 2010/6/4 | 3/4969 | ¥12.00 |
| 63668 | 巫峡长江大桥施工技术.ppt | dragonhealthy | 6,971KB | .ppt | 2010/6/4 | 1/1356 | ¥6.00 |
| 63667 | 汲水门桥简介.ppt(英文) | dragonhealthy | 5,769KB | .ppt | 2010/6/4 | 0/1371 | ¥2.00 |
| 63666 | 大跨度斜拉桥结构计算分析研究 | guowhlg | 8,530KB | .rar | 2010/6/3 | 0/2221 | ¥4.00 |
| 63665 | midas-fea索塔锚固区视频(3/3) | pyj643921 | 10,598KB | .rar | 2010/6/3 | 1/1926 | ¥4.00 |
| 63664 | midas-fea索塔锚固区视频(2/3) | pyj643921 | 15,728KB | .rar | 2010/6/3 | 2/1961 | ¥4.00 |
| 63663 | midas-fea索塔锚固区视频(1/3) | pyj643921 | 15,728KB | .rar | 2010/6/3 | 2/2164 | ¥4.00 |
| 63662 | ★市政工程投资估算指标(道路、给水、燃气、供热、防洪) | systemwang | 16,920KB | .rar | 2010/6/3 | 12/2923 | ¥10.00 |
| 63661 | 佛山海怡大桥主桥监控方案 | pyj643921 | 3,272KB | .doc | 2010/6/3 | 4/2057 | ¥12.00 |
| 63658 | 高速铁路施工表格大全(word形式) | cjtielu | 539KB | .doc | 2010/6/3 | 1/1311 | ¥6.00 |
| 63657 | 合肥至福州客运专线施工组织 | cjtielu | 2,630KB | .doc | 2010/6/3 | 3/2263 | ¥10.00 |
| 63656 | ★2010公路桥梁设计规范使用技术疑难问题暨新技术讲解班录音(3/3) | rockman88888888 | 17,277KB | .rar | 2010/6/3 | 9/1637 | ¥10.00 |
| 63654 | 芜湖桥技术总结 | cjtielu | 594KB | .rar | 2010/6/3 | 4/1086 | ¥10.00 |
| 63653 | ★市政工程投资估算指标(排水、桥梁工程) | systemwang | 13,296KB | .rar | 2010/6/3 | 16/3311 | ¥10.00 |
|